Page not found

Error message

If you are looking for a meeting document, visit the https://meetings.wcpfc.int
If you are looking for a circular, visit the https://circs.wcpfc.int

Search results

  1. VU additional information as reply to full draft CMR

    Additional Information WCPFC-TCC10-2014-dCMR addinfo_VU 24 Sept 2014.pdf VANUATU_additional information as ... system (VU FIMS) to capture data and will be provide in the Part 1 report. CMR issue (RY 2012) Based on ... CMR (WCPFC-TCC10-2014-dCMR01_rev1)- posted 14 September 2014 Additional Information provided by CCM ...

    Ana Taholo - 24 Sep 2014 - 9:28pm

  2. DRAFT Summary Report of TCC Special session and draft revised CMR Executive Summary covering 2014 activities-for CCM comments due Tue 1 Nov 3pm (Bali time)

    / Special TCC session 2015 WCPFC-2015-SpecialTCC Draft Summary Report- for CCM comments_rev1.pdf DRAFT ... work developing the Secretariat’s compliance case file system on the IMS, which would allow the ... Download (29.72 KB) Dedicated CCM Section / MCS / Compliance Monitoring Reports / CMR 2015 / Provisional ...

    Lara Manarangi-Trott - 30 Nov 2015 - 3:30pm

  3. Excel export of 2016 fCMR covering 2015 activities

    "fishing for NP albacore" Actual Value = 23 Comment on Actual Value = AR Part 1 2015 pg 7- In 2015, ... system. The AR Pt 1 2015 has been revised to capture this. This revision in transhipment number is only 19 ... CCM Section / MCS / Compliance Monitoring Reports / CMR 2016 / Commission fCMR 2016 covering 2015 ...

    Ana Taholo - 16 Jun 2017 - 11:30am

  4. Summary from Part 2 of CMM 2013-07 para 19 annual report

    https://www.wcpfc.int/system/files/WCPFC13-2016-DP27%20EU%20Article%2030%20report%20Nov%202016.pdf European Union ... CCM Section / MCS / Subsidiary Bodies- Annual Report Part 2 2014 and onwards WCPFC-TCC13-2017-13.xlsx ... AR Pt2 2016 CMM 2013-07 19 SeqNo REQUIREMENT REQUIREMENT:Brief Description Implemented? Further ...

    Ana Taholo - 12 Aug 2017 - 12:28pm

  5. Draft CMR as @ 12 Sept 2018

    Symbol:  WCPFC-TCC14-2018-dCMR01 Date of Issue:  Wednesday, September 12, 2018 Download (405.27 ... KB) Dedicated CCM Section / MCS / Compliance Monitoring Reports / CMR 2018 / Draft Draft CMR as @ 12 ... Sept 2018.xlsx dCMR as @ 12 Sept 18 CCM CMR Section CMM Paragraph CMM CCM Assessment Applicability ...

    Lara Manarangi-Trott - 13 Sep 2018 - 11:47am

  6. Ecuador AR Pt 2 response to compliance issues in Prov CMR 2012

    required for 2011? CCM Response (if none received to date) Compliance or Implementation Status AR Part ... Monitoring Scheme states "Each CCM shall include, in its Part 2 Annual Report, any actions it has taken ... Symbol:  EC Date of Issue:  Friday, September 13, 2013 Download (20.24 KB) Dedicated CCM Section ...

    Lara Manarangi-Trott - 13 Sep 2014 - 12:01am

  7. Solomon Islands AR Pt 2 response to compliance issues in Prov CMR 2012

    Implementation Status AR Part 2 2012 CCM Reponses Catch and effort limits CMM 2010-07 Sharks para 7: Implement 5% ... Compliance Monitoring Scheme states "Each CCM shall include, in its Part 2 Annual Report, any actions it ... Symbol:  SB Date of Issue:  Friday, September 13, 2013 Download (20.57 KB) Dedicated CCM Section ...

    Lara Manarangi-Trott - 13 Sep 2014 - 12:01am

  8. Vessel Monitoring System

    to the Commission VMS the flag CCM will submit all necessary data to complete its data file in the ... Islands Vanuatu 27 October 2020 28 November 2020 National waters of Vanuatu Papua New Guinea 1 September ... into the part of the Convention Area bounded by 20°N and 175°E (the area for which a VMS implementation ...

    Eighty Options - 20 Feb 2024 - 8:47am

  9. 2017 Provisional CMR covering 2016 activities_rev1- adopted at TCC13

    covering 2016 activities REV1- adopted by TCC13.pdf CLEAN as adopted by TCC13 on 3 October 2017 2017 ... Tuvalu,Chinese Taipei, UnitedStates, Vanuatu CMM 2014-02: Vessel Monitoring System Para (4) Cook Islands, ... Symbol:  WCPFC-TCC13-2017-pCMR_rev1 Date of Issue:  Wednesday, October 4, 2017 Download (982.42 ...

    Ana Taholo - 9 Oct 2017 - 10:05am

  10. Kiribati AR Pt 2 response to compliance issues in Prov CMR 2012

    required for 2011? CCM Response (if none received to date) Compliance or Implementation Status AR Part ... Monitoring Scheme states "Each CCM shall include, in its Part 2 Annual Report, any actions it has taken ... 2 2012 CCM Reponses (AR Pt 2 for 2012 not received yet) Catch and effort limits 2010-07 Sharks para 7: ...

    Lara Manarangi-Trott - 13 Sep 2014 - 12:01am

Pages

© Copyright 2024 Western and Central Pacific Fisheries Commission, All rights reserved. Hosted & Developed by Eighty Options ▲ Back to Top