Page not found

Error message

If you are looking for a meeting document, visit the https://meetings.wcpfc.int
If you are looking for a circular, visit the https://circs.wcpfc.int

Search results

  1. DRAFT Final Compliance Monitoring Report- Appendix 1

    11 ii 0 0 0 1 1 1 1 1 0 0 1 1 1 1 1 0 0 0 0 1 3 0 1 1 0 2 1 0 0 0 1 1 1 0 3 0 0 20 3 15% vii ... 0 0 0 1 1 1 1 1 0 0 1 1 1 1 1 0 0 0 0 1 1 0 1 1 0 1 2 0 0 0 1 1 1 0 1 0 0 20 1 5% CMM 2009-06 13 v 0 0 0 1 0 0 1 0 0 0 1 0 1 1 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 1 1 0 1 0 0 10 ... 2009-06 35 a (iii) ii 0 0 0 1 0 0 1 0 0 0 1 0 1 1 0 0 0 0 0 0 3 0 0 1 0 0 0 0 0 0 0 1 1 0 3 0 0 10 2 20 ...

    Lara Manarangi-Trott - 12 Dec 2018 - 6:37am

  2. REPORT OF THE SECOND WPEA – NSAP TUNA DATA REVIEW WORKSHOP, 12-13 May 2011, Manila, Philippines

    the ‘larger’ vessels generally above 10t/day. 0 5 10 15 20 25 30 35 200401 200501 200601 200701 200801 ... sites.......................................... 20 APPENDIX 10 – Review of NSAP species composition and size data by region (major tuna gears ... days following the two workshops. Unfortunately, SPC Database developers do not have the time available ...

    EightyOptions - 1 Aug 2012 - 3:18pm

  3. Interim Register List

    ","Hyeon, Hae Kyoung",117,411,46,"2009",20.00,102.70," ... 9604,"MUMBAI",189,"396408","9V8929",58,"BUNKER","MUMBAI SINGAPORE PTE LTD.","6 SHENTON WAY 18-08A DBS BUILDING SINGAPORE 068809 ","O ... SUNG OG",117,411,46,"2009",20.00,102.70," ...

    EightyOptions - 12 Jun 2013 - 10:01am

  4. West Pacific East Asia Project

    Alice McDonald WPEA Project Manager (342.68 KB) 10 Jul 2020 2019 WPEA-ITM Activity Design Document ... variation (5.69 MB) 10 Jul 2020 2019 WPEA-ITM Activity Progress Report for 2019 Alice McDonald WPEA Project ... MB) 20 Nov 2009 2010 FIRST WPEA – NSAP TUNA DATA REVIEW WORKSHOP, 13-14 May 2010, Manila, Philippines ...

    EightyOptions - 31 Jul 2021 - 4:22pm

  5. Conservation and Management Measure to Establish a List of Vessels presumed to Have Carried out Illegal, Unreported and Unregulated Fishing Activities in the WCPO (Replaced by CMM 2010-06)

    least 120 days before the annual meeting of the Technical and Compliance Committee (TCC), CCMs shall ... receipt of the notification. If no acknowledgement is received within 10 days of the date of transmittal, ... all CCMs, as well as to non-CCMs with vessels on the list, at least 90 days before the TCC’s annual ...

    EightyOptions - 15 Nov 2014 - 12:01am

  6. Comparative matrix of WCPFC member obligations iwth Philippine policy/law/institutional arrangements- progress

    para 3(j) vessels on the WCPFC IUU Vessel list may transmit, at least 20 days before the TCC annual ... in days fished into areas within Conv Area south of 20 deg N b. CCMs shall not transfer fishing ... effort in days fished in the purse seine fishery to areas within Conv Area north of 20 deg N FAO236 s. ...

    EightyOptions - 13 Dec 2012 - 4:09pm

  7. Any Member may under rule 3 of the Rules of Procedure request the inclusion of supplementary items in the agenda for WCPFC17

    Executive Director may, at least thirty days before the date fixed for the opening of a regular session ... referred to in rule 36 at least twenty days before the opening of the session. ...

    Anonymous (not verified) - 16 May 2022 - 12:30pm

  8. Conservation and Management Measure for the Compliance Monitoring Scheme

    adopted by WCPFC18 Symbol:  CMM 2019-06 Date of Issue:  Wednesday, December 11, 2019 Download (377.28 KB) ... / Compliance Monitoring Reports / Past final CMS CMMs Att Q_CMM 2019-06 Compliance Monitoring Scheme adopted at ...

    Lara Manarangi-Trott - 21 Feb 2022 - 3:15pm

  9. enclosures to Summary from Part 2 of CMM 2013-07annual report- RY2018

    Symbol:  WCPFC-TCC15-2019-11_suppl Date of Issue:  Thursday, August 1, 2019 Download (55.43 KB) ... Contextual Statement.pdf US Assistance Provided to SIDS for 2018_28 June 2019_FINAL.pdf ...

    Lara Manarangi-Trott - 9 Dec 2020 - 3:22pm

  10. Options for funding the service needs of the Commission

    funding formula for assessed contributions. Those options were a 10/20/70 split or a 20/20/60 split of ... as low as possible. Noting this later point it is, therefore, suggested that the 10/20/70 split ... initial basis for further discussion by WG. I. If the 10/20/70 funding scenario first presented at MHLC ...

    EightyOptions - 20 Mar 2009 - 6:04am

Pages

© Copyright 2025 Western and Central Pacific Fisheries Commission, All rights reserved. Hosted & Developed by Eighty Options ▲ Back to Top