Page not found
Search results
-
Longline Mitigation Options for Sharks (I)(2015)
thresher sharks. WCPFC-SC10-2014/EB-WP-01, Majuro, Republic of the Marshall Islands, 6–14 August 2014. ... WCPFC-SC7-2011/EB-WP-01, Pohnpei, Federated States of Micronesia, 9–17 August 2011. Curran, D. (2014). Shark catch in ... assessment. WCPFC- SC11-2015/SA-IP-07, Pohnpei, Federated States of Micronesia, 5–13 August 2015. Ward, P., ...
Samuelu Taufao - 22 Jul 2017 - 4:36pm
-
2nd Draft Consolidated Text for the Conservation and Management Measures for Sharks (for review by SC14)
Scientific Data to be Provided to the Commission (WCPFC Key Document Data-01)the WCPF Convention and agreed ... listed in Scientific Data to be Provided to the Commission (WCPFC Key Document Data-01).The key shark ... 3022. This CMM shall replace CMM 2010-07, 2011-04, 2012-04, 2013-08, and 2014-05. Annex 1: Schematic ...
Lara Manarangi-Trott - 30 Jan 2019 - 11:22am
-
Conservation and Management Measure for the Eastern High-Seas Pocket Special Management Area
(219.75 KB) Download (136.07 KB) Folder: CMM and Resolutions / Replaced Conservation and Management ...
EightyOptions - 2 Mar 2017 - 4:15pm
-
Conservation and Management Measure for Swordfish in the South West Pacific (Replaced by CMM 2008-05)
number of vessels that have fished for swordfish in the area south of 200S no later than 90 days after ...
EightyOptions - 15 Nov 2014 - 12:01am
-
Pacific Islands- Regional Plan of Action for Sharks
Council, and SPC Heads of Fisheries. The consultancy is for a period not exceeding 76 days (i.e. 76 days ... @ $500 USD a day). Payment for the consultancy will be made consistent with standard FFA contract where ... fees 76 days @ $500 $38,000 Stage 1 – document outline $6,000 Stage 2- final regional Shark Plan ...
EightyOptions - 14 Apr 2009 - 9:29am
-
Conservation and Management Measure for Charter Notification Scheme (Replaced by CMM 2011-05)
Participating Territory shall notify the Executive Director as well as the flag State, within 15 days, or in any ...
EightyOptions - 15 Nov 2014 - 12:01am
-
Internships and Attachments- Guidelines
90 days in advance of the proposed internship or attachment. Funding and insurance • The Secretariat ...
EightyOptions - 20 Feb 2015 - 12:01am
-
EOI: Study on Optimization of WCPFC Program Operational Costs, including through Cost Recovery
provided to Secretariat 75 days prior to TCC7. The Secretariat will review and provide comment on the draft ... report within 15 days of receipt. The consultant(s) shall provide a revised draft addressing the comments ... received to the Secretariat within 15 days. 6 The Secretariat shall circulate the report to CCMs at least ...
EightyOptions - 21 Jan 2011 - 9:56am
-
Conservation and Management Measure for Compliance Monitoring Scheme (replaced by CMM 2011-06)
each CCM 5 days after the receipt of the CCM’s Part 2 Annual Report or at least 25 days in advance of ... Report, each CCM may reply to the Executive Director, if possible at least 12 days in advance of TCC, in ... needed to assist the CCM to address potential compliance issues. 12. At least 7 days in advance of TCC, ...
EightyOptions - 17 Feb 2021 - 9:43am
-
Letter of Authorisation for New Australian Patrol boats
inspections pursuant to CMM 2006-08 until after the expiry of the 60 day period following the circulation to ...
EightyOptions - 24 Aug 2011 - 11:35am