Page not found

Error message

If you are looking for a meeting document, visit the https://meetings.wcpfc.int
If you are looking for a circular, visit the https://circs.wcpfc.int

Search results

  1. Secretariat Quarterly Reports

    a nine-day SC meeting structure, two days less than before, was adopted intersessionally among the Commission ...

    EightyOptions - 31 Aug 2010 - 11:20am

  2. Proposal for CMS IWG Meeting

    developing CCMs for a one day meeting of the working group as requested above. 2 Since there was no explicit ... the Marshall Islands to have a one day meeting for the CMS-IWG on 25th September 2018 immediately ...

    Lara Manarangi-Trott - 4 Sep 2018 - 12:30am

  3. Service needs of the Commission and options and secretariat structures for the delivery of such services

    approximately US$12.50 per cubic metre of fish well space (the programme is limited to purse seine vessels). For ... a 1000 cubic metre vessel this equates to an annual fee of approximately US$12,500. Use of existing ...

    EightyOptions - 20 Mar 2009 - 6:04am

  4. Final Report on Working Group I

    the establishment of a vessel register. 12. WG.I briefly considered document WCPFC/PrepCon/WP.8 on the ... m after three years) and US$ 1.2 m for external services. � For purposes of illustration only, the summary ...

    EightyOptions - 20 Mar 2009 - 6:16am

  5. Thailand Port State Measures Notification

    9. Beam (ความกวาง)/M (เมตร) 10. Draft (กินนํ้าลึก)/M (เมตร) 11. Size (ขนาดเรือ)/GT (ตันกรอส) 12 ...

    Lara Manarangi-Trott - 6 May 2020 - 11:25am

  6. Electronic Reporting

    WCPFC-TCC16-2020-RP10 Annual Report on the Performance of the E-reporting Standards Secretariat and SPC-OFP (161.06 KB) ... 1 Sep 2020 WCPFC-TCC17-2021-RP10 Annual Report on the Performance of the E-reporting Standards ...

    Lara Manarangi-Trott - 8 Aug 2019 - 11:13am

  7. WG.I, Application of cost recovery principles to the provision of Comission services

    example, supporting a service the need for which is not generated by the activity of their vessels. 12. In ...

    EightyOptions - 20 Mar 2009 - 6:04am

  8. Report on Status of Preparatory Conference Organizational Fund and Preparatory Conference Secretariat

    developing States and territories in Standing Committee. 12. The Conference may wish to provide direction on ...

    EightyOptions - 20 Mar 2009 - 6:04am

  9. Background paper on possible components for regional vessel and gear marking systems

    appropriate, to monitor and control the activities of fishing vessels and fishing support vessels. 12 ...

    EightyOptions - 20 Mar 2009 - 6:04am

  10. Conservation and Management Measure for the Regional Observer Programme

    Secretariat 12. Consistent with Article 15(4), the role of the Secretariat will be to: a) coordinate ROP ...

    EightyOptions - 31 Aug 2021 - 9:19am

Pages

© Copyright 2025 Western and Central Pacific Fisheries Commission, All rights reserved. Hosted & Developed by Eighty Options ▲ Back to Top