Page not found

Error message

If you are looking for a meeting document, visit the https://meetings.wcpfc.int
If you are looking for a circular, visit the https://circs.wcpfc.int

Search results

  1. Intersessional Working Group on the Regional Observer Programme (ROP-IWG)

    development of new CMMs that have and will impact the ROP. Also, experience with existing ROP data collection ... Title Files Date of Issue WCPFC-ROPIWG5-2025 ROP-IWG5 Chairs Summary Report (430.59 KB) 23 Apr 2025 ... below: Symbol Title Files Date of Issue WCPFC-TCC18-2022-17 Supporting paper for TCC18 consideration of ...

    Lara Manarangi-Trott - 5 May 2025 - 7:56pm

  2. REPORT OF THE FIRST INDONESIA (WCPFC AREA) TUNA FISHERIES ANNUAL CATCH ESTIMATES REVIEW WORKSHOP, 8-9 March 2010, Jakarta, Indonesia

    (March 2010).pdf REPORT- Indonesia Ann Cat Est Review WS (March 2010) REPORT OF THE FIRST INDONESIA ... reporting structure of the statistical system starts with the survey form (sampling) at the district level ... the current system include: • Data of production by species and fishing gear hasn’t been covered in ...

    EightyOptions - 1 Aug 2012 - 3:06pm

  3. Conservation and Management Measure for the Commission VMS

    CMM-2011-02-Conservation-and-Management-Measure-Commission-VMS.pdf SECOND REGULAR SESSION OF THE TECHNICAL AND COMPLIANCE COMMITTEE OF THE COMMISSION EIGHTH REGULAR ... SESSION Tumon, Guam, USA 26-30 March 2012 COMMISSION VESSEL MONITORING SYSTEM1 Conservation and Management ... vessel monitoring system as a tool to effectively support the principles and measures for the ...

    EightyOptions - 9 Feb 2015 - 2:08pm

  4. WCPFC vacancy: Information, Communications and Technology (ICT) MANAGER

    Download (15.79 KB) Folder:  News ICTManager.pdf DATA (ICT) MANAGER Re-advertisement VACANCY ... and security, systems design, data management and communication technology and applications. In ... development and administration of satellite-based systems for monitoring fishing operations and the possible ...

    EightyOptions - 4 Apr 2009 - 6:59am

  5. US comments on E-reporting fields

    Symbol:  US Date of Issue:  Friday, September 16, 2016 Download (13.22 KB) Dedicated CCM Section ...

    Lara Manarangi-Trott - 16 Nov 2016 - 2:12pm

  6. Operational Catch and Effort Data

    OPERATIONAL Catch and Effort data.pdf Microsoft Word- SC3 ST-SWG Reporting obligations- OPERATIONAL Catch and ... a trip is defined to occur when a vessel (a) leaves port after unloading part or all of the catch to ... transshipping part or all of the catch at sea (when this occurs in accordance with the terms and conditions of ...

    EightyOptions - 30 Mar 2009 - 4:18pm

  7. Homework following TCC14- re: taskings from working draft CMM on CMS revision 2

    2, 2018 Download (338.05 KB) Dedicated CCM Section / Inter-sessional / CMS-IWG 2018 ... WCPFC-2018-CMSIWG-Homework rev1.pdf Homework in the margin of TCC14 Meeting of the Compliance Monitoring Scheme ... considered in light of paras 7 and 16. Para 3: USA, Canada and FFA (alternative text provided; all Members to ...

    Lara Manarangi-Trott - 3 Oct 2018 - 4:43pm

  8. CNM Flowchart

    Guidelines Procedures and Regulations CNM flowchart.pdf Was the application to request CNM status (new or ... (new or renewal) submitted in English at least 60 days before the TCC? (Para. 1) Yes No CNM status is ... against CNMs deemed to have undermined CMMs. (Paras. 15 and 16). CNM status is not renewed or accorded by ...

    EightyOptions - 17 Feb 2015 - 8:39pm

  9. Final report of the third meeting of the Scientific Coordinating Group

    Maritimes BP 36, Noumea, 98845 Tel: (687) 27.26.26 Fax: (687) 28.72.86 retaix-bonnin@gouv.nc New Zealand Kim ... WCPFC_PrepCon_41(SCG_3_Report).pdf WCPFC_PrepCon_41(SCG_3_Report).doc SCG 3 Report Preparatory Conference for the COMMISSION FOR THE ... WCPFC/PrepCon/41 Pohnpei, Federated States of Micronesia 16 September 2004 6- 7 December 2004 REPORT OF THE THIRD ...

    EightyOptions - 20 Mar 2009 - 6:16am

  10. Paper on Participation of Territories, 26 February 2002 (France)

    WCPFC_PrepCon_DP7.pdf Microsoft Word- WCPFC PrepCon DP7.doc- 1- PREPARATORY CONFERENCE FOR THE COMMISSION FOR THE ... WCPFC/PrepCon/DP.7 Madang, Papua New Guinea 26 February 2002 25 February – 1 March, 2002 French Proposal Draft rules ... of a declaration, filed with the Depositary, by the Contracting Party having responsibility for the ...

    EightyOptions - 20 Mar 2009 - 4:50am

Pages

© Copyright 2025 Western and Central Pacific Fisheries Commission, All rights reserved. Hosted & Developed by Eighty Options ▲ Back to Top