Page not found

Error message

If you are looking for a meeting document, visit the https://meetings.wcpfc.int
If you are looking for a circular, visit the https://circs.wcpfc.int

Search results

  1. Summary of the work undertaken by the Electronic Reporting and Electronic Monitoring Working Group (ERandEM WG) in 2022

    WCPFC19-2022-ERandEMWG-01 ERandEM WG Chairs Report to WCPFC19.pdf ... Authors:  ERandEMWG Chair Symbol:  WCPFC19-2022-ERandEMWG-01 Date of Issue:  Tuesday, November 15, ...

    Lara Manarangi-Trott - 6 Jan 2023 - 2:09pm

  2. Preparatory Conference Organizational Fund and Preparatory Conference Secretariat

    WCPFC_PrepCon_WP11_Rev_1_Add_2(Status_of_PCOF).pdf WCPFC_PrepCon_WP11_Rev_1_Add_2(Status_of_PCOF).doc WCPFC/PrepCon/WP.11/Rev.1/Add.1 Preparatory ... Symbol:  WCPFC/PrepCon/WP.11/Rev.1/Add. 2 Date of Issue:  Monday, April 19, 2004 Download (20.91 ... WESTERN AND CENTRAL PACIFIC Sixth session WCPFC/PrepCon/WP.11/Rev.1/Add.2 Bali, Indonesia 19 April 2004 19 ...

    EightyOptions - 20 Mar 2009 - 6:04am

  3. Summary report by the Chair of Working Group II to the fifth session of the Preparatory Conference

    WCPFC_PrepCon_32(Summary_Report_by_Chairman_of_WG.II).pdf WCPFC_PrepCon_32(Summary_Report_by_Chairman_of_WG.II).doc Tentative Agenda for Informal Meeting of ... report of SCG 2 (WCPFC/PrepCon/28), including summary statements on the status of stocks (Agenda item 5) ... Adoption of the agenda Consideration of the provisional structure for the scientific functions of the ...

    EightyOptions - 20 Mar 2009 - 6:16am

  4. North Pacific Blue Shark Stock Assessment using BSP (2014)

    North Pacific Blue Shark Assmt Report 2014 Rev 1.pdf Microsoft Word- BSH assessment report 7-21-14-for ... Pacific Ocean WCPFC-SC10-2014/ SA-WP-14 Rev 1 Report of the Shark Working Group1 1 International ... assessment in 2014 (WCPFC 2013). In this revised assessment, two modeling approaches (BSP and SS) and five ...

    Samuelu Taufao - 22 Jul 2017 - 4:30pm

  5. WCPFC Monitoring, Control and Surveillance (MCS) and Compliance Monitoring

    operational on adoption during the Commission’s Inaugural Session in December 2004.  These included the WCPFC ... 2018-06, which replaced CMM 2013-10, CMM 2004-01 and CMM 2009-01), Procedures for Cooperating Non-members (CMM ... 2019-01, which replaced CMM 2009-11 and CMM 2004-02) and Specifications for the Marking and Identification ...

    EightyOptions - 2 Apr 2024 - 8:39am

  6. Comments by the Republic of Korea on the formula for the scheme of contributions (Republic of Korea)

    WCPFC_PrepCon_DP20(Korea_comments_on_contributions formula).pdf WCPFC/PrepCon/DP.20- 1- PREPARATORY CONFERENCE FOR THE COMMISSION FOR THE ... ASSESSMENT OF CONTRIBUTIONS TO THE BUDGET OF THE COMMISSION (WCPFC/WP.13/Rev.1) Submitted by the delegation ... (WCPFC/PrepCon/WP.13/Rev.1/ dated 17 September 2003), as follows. They focus on the relative weight given to criteria for the ...

    EightyOptions - 20 Mar 2009 - 4:50am

  7. Deadline for requests for Cooperating Non-Member status in 2024 (CMM 2019-01 para 1)

    https://www.wcpfc.int/doc/commission-07b/cooperating-non-member-request-template https://www.wcpfc.int/doc/cmm2019-01 ...

    Anonymous (not verified) - 16 Jan 2023 - 3:00pm

  8. Approved MTU/ALC-Jan19-2022

    Surveillance (MCS) / Vessel Monitoring System Approved MTU- 19January2022.pdf ...

    Albert Carlot - 4 Feb 2022 - 12:03pm

  9. Terms of Reference for Working Group III: Monitoring, control and surveillance

    KB) Folder:  Preparatory Conference / Conference Documents / Conference Papers WCPFC_PrepCon_13.pdf ... agenda item XI: ‘Mechanisms to promote participation’ (WCPFC/PrepCon/10), the Conference agrees to ... Symbol:  WCPFC/PrepCon/13 Date of Issue:  Friday, March 1, 2002 Download (62.07 KB) Download (24 ...

    EightyOptions - 20 Mar 2009 - 6:16am

  10. Effective date for CMM 2021-01 para 17 FAD design and construction requirements, which are intended to reduce the risk of entanglement of sharks, sea turtles or other species

    the WCPFC Convention Area shall comply with the following specifications: (a) The use of mesh net ...

    Anonymous (not verified) - 21 Mar 2023 - 3:09pm

Pages

© Copyright 2025 Western and Central Pacific Fisheries Commission, All rights reserved. Hosted & Developed by Eighty Options ▲ Back to Top