Page not found

Error message

If you are looking for a meeting document, visit the https://meetings.wcpfc.int
If you are looking for a circular, visit the https://circs.wcpfc.int

Search results

  1. Deadline for CCMs to submit Annual Report Part 2 (RY 2018)

    Deadline 1 Jul 2019 Location:  Federated States of Micronesia Annual Report Part 2 including ... various required reporting for calendar year 2018, are due to be submitted to the Secretariat by 1 July ... 2019. As agreed by the Commission, CCMs are to use the online reporting tool provided at ...

    Anonymous (not verified) - 16 May 2022 - 12:30pm

  2. PG dCMR AddInfo received after 12 Sept_Att

    Guinea (ii) CMM 2013-05 01-- "Potential compliance issue" As @ 25 July, AR Part 2 have not been ... New Guinea (ii) CMM 2013-05 02-- "Potential compliance issue" As @ 25 July, AR Part 2 have ... CMM 2011-03 05-- "Potential compliance issue" as @ 25 Jul, there was no alleged incidents in ...

    Ana Taholo - 26 Sep 2017 - 9:38pm

  3. ID dCMR AddInfo received after 12 Sept

    – 3 October 2017 Pohnpei, Federated States of Micronesia Additional information received post 12 September ... WS 2017), currently funded by WPEA ($ 12.000) 2. Shark identification: Training (from national ... Report (dCMR). TCC12 recommended that information being provided in writing improves TCC’s ability to ...

    Ana Taholo - 26 Sep 2017 - 9:27pm

  4. Deadline for Secretariat to issue an update of pCMR scores based on additional information and issue a summary of these updates for consideration by the Commission (CMM 2019-06 41)

    additional information up to 21 days after TCC. Additional information is restricted to that which only ... CCMs, 21 days after the deadline to submit additional information, based on the additional information ... Commission for their consideration, along with the pCMR.    https://www.wcpfc.int/doc/cmm-2019-06 ...

    Anonymous (not verified) - 16 May 2022 - 12:30pm

  5. Cutoff date for relevant CCMs to submit additional information or clarifications, if it is to be considered in the version of summary paper prepared by Secretariat drawing from WCPFC online compliance case file system (CMM 2019-06 para 28)

    Where such additional information or clarification is provided, at least fifteen days in advance of the ... under paragraph 26. https://www.wcpfc.int/doc/cmm-2019-06 ...

    Anonymous (not verified) - 16 May 2022 - 12:30pm

  6. Deadline for CCMs to provide additional information for the prov CMR but is limited to filling an information gap that only requires administrative consideration by the Secretariat (CMM 2019-06 40)

    additional information up to 21 days after TCC. Additional information is restricted to that which only ... the provision of additional information.   https://www.wcpfc.int/doc/cmm-2019-06 ...

    Anonymous (not verified) - 16 May 2022 - 12:30pm

  7. Cutoff date for relevant CCMs to submit additional information or clarifications, if they are to be considered in the version of summary paper prepared by Secretariat drawing from WCPFC online compliance case file system (CMM 2019-06 para 28)

    Where such additional information or clarification is provided, at least fifteen days in advance of the ... under paragraph 26. https://www.wcpfc.int/doc/cmm-2019-06 ...

    Anonymous (not verified) - 16 May 2022 - 12:30pm

  8. Deadline for CCMs to provide additional information for the prov CMR but is limited to filling an information gap that only requires administrative consideration by the Secretariat (CMM 2019-06 40)

    additional information up to 21 days after TCC. Additional information is restricted to that which only ... the provision of additional information.   https://www.wcpfc.int/doc/cmm-2019-06 ...

    Anonymous (not verified) - 16 May 2022 - 12:30pm

  9. Conservation and Management Measure on Mobulid Rays caught in association with fisheries in the WCPFC Convention Area

    Symbol:  CMM 2019-05 Date of Issue:  Wednesday, December 11, 2019 Download (139.4 KB) Folder:  CMM ... and Resolutions / Conservation and Management Measures (currently in force) Att O_CMM 2019-05 Mobulid ...

    Lara Manarangi-Trott - 7 Jan 2021 - 9:29am

  10. ICCAT Report- first meeting of the ad hoc working group on FADs (Madrid, Spain, 11-12 May 2015)

    2015_ICCAT_FADs_WG_report.pdf 1 FIRST MEETING OF THE AD HOC WORKING GROUP ON FADs (Madrid, Spain, 11-12 May 2015) 1. Opening of ... the meeting The Meeting was held at the ICCAT Secretariat in Madrid from May 11 to 12, 2015. The ... 9 L. Dagorn Item 10 P. Bannerman Item 11 P. Daniel Item 12 J. Konan and D. Die 4. Terms of reference of ...

    Lara Manarangi-Trott - 8 Jun 2015 - 4:53pm

Pages

© Copyright 2024 Western and Central Pacific Fisheries Commission, All rights reserved. Hosted & Developed by Eighty Options ▲ Back to Top